Special ── 2026-11-08
Huawei Horinger Has 1/14 the Compute of the US Leader
Epoch AI estimates 81,000 H100e, about one-fourteenth of Colossus 2
What changes
China has abundant energy for data centers. Yet Epoch AI's analysis shows that power alone does not close the AI compute gap. According to Epoch AI, Chinese chips trail Nvidia's best in both performance and energy efficiency.
Readers who track data center plans and investment cannot judge a site by building count or power capacity alone. The type and number of chips matter as well.
Why it matters
Epoch AI says Huawei's campus is still under construction. Its compute could grow by over 70% by early 2028.
Even so, Epoch AI expects Colossus 2, the largest US site, to reach at least 1.8 million H100e by 2028. These figures suggest the gap may not narrow soon.
What the report says
Epoch AI estimates the compute of Huawei's Horinger campus in Inner Mongolia at 81,000 H100-equivalents (H100e). The 90% confidence interval is 36,000 to 141,000. An H100e is a unit based on the 8-bit operations per second of one Nvidia H100 chip.
Epoch AI says this is one of the largest data centers in China. But it holds about one-fourteenth the compute of Colossus 2 in Tennessee, the world's largest AI data center. Epoch AI describes Colossus 2 as SpaceX's.
Chips are the main cause. Epoch AI says the Ascend 910C reaches about 0.76 H100e in peak performance. Nvidia's B200 and B300 reach about 2.5 H100e and are about 2.5 times more energy-efficient. A given amount of power can therefore support only 40% of the compute of leading US facilities.
Who and what scope
Epoch AI published the report. It studied Huawei's Horinger campus in Inner Mongolia, China. It also searched major Chinese AI data center hubs broadly to make comparisons.
Epoch AI lists eight sites that began deploying the Ascend 910C in 2025. Four belong to Huawei. The other four belong to China Telecom, China Mobile, China Unicom and the Shenzhen Longgang government. Among Chinese sites it reviewed, Epoch AI says only VNET Bayin Ulanqab and Huawei Wuhu are likely to match or slightly exceed Horinger.
Why this report
The report asks how close China's AI compute comes to the global frontier. Epoch AI notes that China has plentiful energy but that Huawei makes far fewer chips than Nvidia.
It uses the Horinger campus as a case study to show how this constraint appears at a real site.
How they studied it
Epoch AI used commercial high-resolution satellite images and public sources. Its main method is a cooling equipment model. From the type, size and number of cooling units, it estimates heat rejection capacity and then each building's IT power capacity. IT power means the power used by servers and related equipment.
It focused on four apparently complete buildings with dense cooling. The model gives 286 MW in total. Two other sources give similar figures: 304 MW from substation details and 230 MW from backup generator capacity.
Epoch AI then assumed a rack occupancy of about 76%. It also used Huawei chip sales over time, with a four-month lag from sale to deployment. The result is about 105,000 Ascend 910C and 8,000 Ascend 910B chips in operation.
Key points
- Epoch AI estimates Huawei Horinger at 81,000 H100e, about one-fourteenth of Colossus 2.
- The Ascend 910C reaches about 0.76 H100e, so a given power supply supports only 40% of the compute of leading US facilities.
- Compute should grow by over 70% to about 141,000 H100e by early 2028, but a large gap to Colossus 2 would remain.
Conclusion
According to Epoch AI, Huawei Horinger is among China's largest AI data centers. It still holds about one-fourteenth the compute of the largest US site.
Its compute is expected to grow by over 70% by early 2028. But Epoch AI expects Colossus 2 to grow substantially over the same period.
Quotes and sources
“Despite being one of the largest data centers in China by AI computing capacity, it has less than one-tenth the capacity of the world’s largest AI data center, Colossus 2 in Tennessee.”── Epoch AI, 2026-11-06
“So although China has abundant energy for data centers, the efficiency gap creates a relative disadvantage for their home-grown AI infrastructure, as a given amount of power capacity can only support 40% of the compute of leading US facilities.”── Epoch AI, 2026-11-06
“our best estimate is that most of the capacity is installed, and most of the installed chips are Ascend 910C.”── Epoch AI, 2026-11-06
“Assuming the new building is as AI-focused as the existing buildings, the campus could grow its total AI compute by over 70% by early 2028.”── Epoch AI, 2026-11-06
Source articles
- Epoch AI 2026-11-06
Written by AI (Claude) from the report and its coverage, then checked by Jev (TypeSafe's judgement model), a Gemini fact-check and a verbatim check of every quote.